Knowledgebase
Knowledgebase
Programming Note & Coin Loaders
Posted by J Mitchell on 09 May 2017 02:18 PM

Coin Loader

  • Connect USB to Computer and the Microcoin Universal Communication Interface.
  • Connect the smaller Red & Black 4 pin cable to the Universal Communication Interface.
  • Connect power to the Universal Communication Interface.
  • Open SPTools 
  • Check that you have a Green connected symbol in the system tray.
  • On the Left side check that the SP is shown under local devices.
  • Click File / Open and select the config to program.
  • Click the button which has a blue square and red arrow.
  • Select the unit to upgrade and press Transfer.
  • Check that the new coins are Enabled.
  • Click Pass
  • Click Skip
  • Click Finish.

 

Note Loader

  • Connect USB to Computer and the Microcoin Universal Communication Interface.
  • Conect the longer cable to the Universal Communication Interface.
  • Connect power to the rear of the note loader.
  • Open GBA Talk Tools
  • Click Comms and Open Comms Port
  • Check that COM3: VAL 364 or similar is selected in the drop down next to the Comms button.
  • Click the Read all Validator Settings button which is below File
  • Select New Firmware / or new dataset
  • Select Open New Firmware / dataset File
  • Select the correct firmware / dataset file
  • Click Open
  • Click Download Firmware
(0 vote(s))
Helpful
Not helpful

Comments (0)
Post a new comment
 
 
Full Name:
Email:
Comments: